HEAVY LIFTING in action

Malta project

Transport & installation of 2 transfo's & 2 reactors from Mechelen to Malta

Specification:
2 transfo's 700x330x400 - 115 Tons/each
2 reactors 430x170x270 - 24.6 Tons/each


Goods were transported by truck from Mechelen to Antwerp, from where they were shipped to Malta. In Malta, after local transport, the goods were unloaded using our hoisting system. Both the transformers and reactors were first fully assembled on the ground and then skidded to their final foundation with our skidding system.


Watch our movie

HEAVY LIFTING + HANDLING NV

Specialist in horizontal, vertical and special transport. Together with engineering and project management, we offer a complete service for:

  • Industrial movement
  • Crane rental
  • Handling of machinery
  • Assembly & disassembly