Creation of Marina
Building the docking industry
CEC reference number: CEC2766/2010
The installation of a jetty for your pleasure craft docking needs. Such will be built in a sheltered harbour with environmental requirements continuously maintained. Accessed via #3 Gardier Street Point Cumana.
Activities Include
Reclamation
With mitigation measures implemented to prevent environmental and social damage
Installation of sheet piling
Backed by stable infrastructure (not actual design, images taken from online for viewer benefit)
Creation of a jetty
More space provided for the ever growing needs of boat owners (not exact, but similar design, images taken from online for viewer benefit)
Other information
- Use of materials for reclamation
- Design of infrastructure with consideration of environmental and socioeconomic impacts
- Unidentified time of completion, however estimated 3-5 years