Plan:: NISC DT Lab
The design cycle plan for the G8 unit extreme makeover.
May 6th, Monday
- I will insert all my designs to the design section (20 minutes)
- I will create my final design and justify (40 minutes)
Resources Needed:
- Smore
- Camera / iPad
- Pencil
- Paper
- Word - Processor
May 7th, Tuesday
- Research about layouts of DT workshops using a search engine. (15 minutes)
- Research about content of DT workshops using a search engine. (15 minutes)
Resources Needed
- Google / other search engines
- Word processor
May 8th, Wednesday
- Making Plan section of the report using Smore. (30 minutes)
- Basic foundation of the model using Google Sketchup. (Which are walls and floor) (60 minutes)
Resources Needed:
- Google Sketchup
- Smore
May 9th, Thursday
- Checking the dimensions of the model using Google Sketchup (10 minutes)
- Complete walls for the model using Google Sketchup (20 minutes)
Resources Needed:
- Google Sketchup
May 10th, Friday
- Making roof of the model using Google Sketchup (40 minutes)
- Making the inside using Google Sketchup (Furnitures, windows, tools and storages) (50 minutes)
Resources Needed:
- Google Sketchup
May 13th, Monday
- Check for mistakes / errors in the model and fix using Google Sketchup (45 minutes)
- Creating the create section using Smore (15 minutes)
Resources Needed:
- Smore
- Google Sketchup
May 15th, Wednesday
- Creating the evaluate section using Smore (45 minutes)
- Testing the product to the test group (45 minutes)
Resources Needed:
- Smore
- Google Sketchup
- Friends
- Kunwoo: as tool supplier
- Chhaya: as architect
- Jakamo: as student
- Ryan: as teacher
May 17th, Friday
- Completing the evaluate section using Smore. (90 minutes)
Resources Needed:
- Smore
- Friends
Reflection
Friday 10th - As I was fallen behind, I did what I was supposed to do on May 8th and May 9th. I have completed the basic foundation of the building and building the wall. Also, I have checked the dimension. Since I am left behind, I should complete making the roof of the model at home. At the start of the class, there were some delays, as we had no dimensions. After getting the dimensions, I have finished making the wall and the basic structures.
Wednesday 15th - We had a group meeting, and as a class, we have decided to finish the create until next week Friday, 24th of May. I have decided to finish until Thursday the 23rd of May, so I could get assistance from Mr. Luke for further steps. The goal for today was creating the evaluate section and testing it to the testing group, but as we have extended the dates, I have finished making windows and ventilations.